TNC2009 site coordination

From Isabel Plaza Wiki

Jump to: navigation, search

This page contains coordination efforts for the organization of the TERENA Networking Conference 2009.

Contents

[edit] Contacts

The table below shows the main contact information for the different coordination aspects required.

Scope Organization Contacts
Venue UMA Malaga
Conference Coordination Terena Amsterdam Organizational: Gyöngyi Horváth
Venue setup UMA Organizational: Victoriano Giralt
Phone:
audiovisuals: Vicente Giles
Network Infrastructure RedIRIS Madrid Technical: Maribel Cosin
Phone:
audiovisuals: Jose Maria Fontanillo
GLOBAL coordination UPM Madrid Organizational: Juan Quemada
Phone: +34-915495700 ext 3039
Monica Cortes
Phone: +34-915495700 ext 3044
Technical: Abel Carril
Phone: +34-915495700 ext 3036


[edit] GLOBAL Attendees

Organization Names
UPM Madrid Juan Quemada
Monica Cortes
Abel Carril
JSI Ljubljana Borka Jerman Blazic
UCL Peter Kirstein
ZSI Wien Dietmar Lampert
Margit Hofer
RedCLARA Chile Florencio Utreras

[edit] Conference Agenda

We require to know in advance: the conference agenda , speaker name, affiliation and position, location from which he/she will speak, presentation, in order to prepare a TV script that eases the transitions between floor control type and caption titles. It is very important for us to know what presentation format the speaker will use; if it is a powerpoint, open office, pdf, etc in order to have the software installed on the VNC server. VNC server works in 800x600, so presentations should be tested on that resolution and tested from remote locations to understand the slide dynamics.

Agenda Point Speaker Position Organization Location (Nick) Presentation type (tested)
CHAIR John Dyer Business and Technology Strategist TERENA
ALICE2: Optical Networking and Research Communities Dr. Florencio Utreras Executive Director CLARA Latin American Cooperation of Research Networks Malaga
4b2 F. F. Tusubira CEO UbuntuNet Alliance for Research and Education Networking in Africa Malaga
Creative destuction, Leapfrogging and Tunneling trhough the Kuznets Curve Bjorn Pehrson Head of the Telecommunication Systems Laboratory KTH Malaga

[edit] Network Infrastructure

Data needed for the ISABEL configuration

Data Value
IP address range for the ISABEL setup configured as a wired VLAN 130.206.241.176/28 (gw 30.206.241.190)
Bandwidth 2Gb uplink to the first REDIRIS POP
Network filtering no filters (maybe in-, out-gress filtering)
Available patches one copper rj45 at control desk, 1 at stage, all connected to the same VLAN 173
Jitter observed
packet loss observed

[edit] Audio/Video infrastructure

We are going to be using the infrastructure provided by a company subcontructed by UMA. We will be using the equipment itemized in section Equipment required. The audio/video setup is shown in the graph below.

The audiovisual setup can be seen here:


audio setupdeployment


Equipment Details (connectors, signal,..)
Audio cabling stereo mini-jack
Video cabling S-video (preferred), composite video

[edit] Equipment Required

Equipment Items Provided by Usage
Laptops 5 UPM isabel stations: speaker frame, audience frame, vnc server, demo server, spare
Speaker Laptop 1 REDIRIS connected to the Isabel VLAN, windows box with RealVNC (port 5900)
Flat screen 1 UMA 42" return screen for stage display of Isabel
GE-Switch 1 UPM connect Isabel equipment
UTP cabling 10 UPM connect Isabel equipment to the switch
Wireless Mics 1-2?  ?? for auditorium questions, stage audio input
Audio mixing board 1  ?? one audio-in, one audio-out for Isabel, rest for mic control
Audio cables 2  ?? short cables to connect the mixer to our stereo mini-Jacks on the control desk
Beamers 1  ?? project Isabel
VGA cables 1  ?? connect Isabel station to the beamers
Operated cameras 2  ?? manned camera inputs go to Isabel stations
Video cables 2  ?? long, connect cameras to video matrix
headset 1 UPM audio verification
walkies 4 UPM team communication

[edit] Setup Logistics

This section contains the actual time schedule for the setup.

We are going to be located at the back of the meeting room together with the contracted company, next to the audio mixer / video matrix, ideal for good collaboration.

Item Availability Tests
Isabel remote stations 1st June first tests to control remote audio/video/network quality
Isabel remote stations 8th June first test with all remote stations together
Connectivity Monday 8th June first test to do on that same day
audio/video tests Monday 8th June?? once venue hall available and setup ready
Venue hall available from Monday 8th June first tests with final setup and remote participants